WF-15 — Research Concept, Ethics Review and Project Registration
| Workflow ID | WF-15 |
| Pack owner | IoL Academic Affairs (decision of 2 September 2026; see Architecture/04_Ownership_Model.md) |
| Family | D — Research and scholarship |
| Channel | C4 educational research portfolio |
| Primary OBEF KPIs | None directly. This workflow produces the register that four other KPIs depend on |
| Contributes to | 4.3 Joint industry research (5.0% prog, 2.5% inst) · 4.4 Student research participation (5.0% prog, 4.5% inst) · 4.5 Research impact (2.0% inst) · 5.4 International research collaboration (2.0%) |
| Programme-level yield | Supports 14.5% |
| Workflow owner | ______________ |
| Data steward | ______________ |
| Version | 0.1 draft |
| Effective | |
| Next review |
This workflow's real function is the launch-year register. KPIs 4.3, 4.5 and 5.4 are cumulative over five years and each project or impact unit is counted once, in the year it is launched, and never again. Without a launch-year register MBRU will either double count, which is an audit finding, or under count, which is lost points, and will not be able to tell which of the two it has done. Registering a project at conception, with its launch year, its partner attributes and its
Linked Programsvalue, is the control that prevents both.
1. Purpose
To ensure that every scholarly activity IoL undertakes is registered at conception with a stable identifier, a launch year and the partner, funding and programme attributes that OBEF requires, that it has passed scientific and ethics review before any data is collected, and that the people involved have settled authorship, data management and conflict of interest in advance, so that the project can be counted exactly once across a five-year window and can be evidenced without anybody having to remember what happened.
2. Scope
Scope statement. This process manages an IoL research or scholarly project from the point at which a concept is proposed, through scientific and ethics review and registration, to the point at which the project record is complete and released to the portfolio for execution and reporting.
Applies to. All scholarly activity led by or hosted within IoL, whether funded or unfunded, whether staff-led or student-led, curricular or extra-curricular, including educational research, health professions education scholarship, curriculum evaluation studies, and creative or developmental scholarly work of the kind the Frascati definition admits in disciplines where traditional research is not the primary form of scholarship. It applies to projects with no external partner as much as to those with one, because the denominator of KPIs 4.3 and 5.4 is all research projects.
Does not apply to. Routine programme monitoring, internal quality assurance activity and service evaluation that does not meet the Frascati criteria; these are WF-04. It does not manage the conduct of the research itself, publication (WF-18), impact capture (WF-19), IP disclosure (WF-20), or the negotiation of partnership agreements (WF-24). It does not replace the MBRU institutional research ethics process; it is the IoL-side workflow that feeds into it and records its outcome. [IoL to confirm] the name, standing and turnaround of the MBRU committee that grants ethics approval, and whether IoL has any delegated authority for minimal-risk educational research.
Applicable requirements. OBEF guide v11.5 KPI 4.3,
4.4, 4.5 and 5.4 counting rules; the Frascati Manual (OECD 2015)
five-criteria definition of research; CHEDS/HEDB
Institute - Research Projects.xlsx; MBRU research ethics
and research integrity policy; UAE personal data protection obligations
for research data; funder and partner terms where these exist.
What counts as a research project, quoted. Any scholarly activity meeting the five Frascati criteria: novel, creative, uncertain in outcome, systematic, and transferable or reproducible. All five, not a majority. Creative activities count in disciplines where traditional research is not the primary form of scholarly activity, which is directly relevant to health professions education, where curriculum development, assessment instrument design and educational innovation can meet all five criteria and are routinely not registered because they do not look like a laboratory study.
Why the denominator matters as much as the numerator. KPIs 4.3 and 5.4 both divide qualifying collaborations by total research projects. Every project registered here without an industry or international partner lowers those two ratios. That is not a reason to under-register: an incomplete denominator is a misstatement, and cross-KPI assertion C2 requires the 4.3 and 5.4 denominators to be identical. It is a reason to apply the Frascati test honestly in both directions, and to record the test that was applied.
3. Trigger, boundary and endpoint
| Trigger | A member of IoL staff or a student proposes a scholarly activity, or an external partner proposes a collaboration involving IoL |
| First activity | Concept note submitted and screened against the Frascati criteria |
| Last activity | Project record released to the portfolio with a
Project ID, a launch year and complete partner, funding and
programme attributes |
| Endpoint | The project exists once in the Launch-Year Register with a stable
Project ID, ethics status recorded, data management plan
lodged, authorship and conflict of interest declared, and
Linked Programs set. The endpoint is a record, not an
approval |
| Upstream workflows | WF-24 partnership and agreement lifecycle (supplies the agreement or MoU that evidences partner awareness) · WF-08 faculty allocation (research time and supervisory capacity) · WF-16 student research (student-led concepts enter here) |
| Downstream workflows | WF-16 student research and capstone supervision · WF-17 research funding, industry and international partnership · WF-18 publication · WF-19 research impact capture · WF-20 IP disclosure · WF-26 OBEF data assembly |
4. SIPOC
| Element | Content |
|---|---|
| Suppliers | IoL academic staff; students and their supervisors; external and health-system partners; MBRU research office and ethics committee; WF-24 partnerships office; funders |
| Inputs | Concept note; Frascati screening; scientific review comments; ethics application and decision; data management plan; privacy and retention assessment; authorship agreement; conflict of interest declarations; partner agreement or MoU reference; funding award or budget; the study plan and Program Codes the project relates to |
| Process | Submit concept → screen against Frascati → scientific review → ethics review and decision → data management and privacy plan → authorship and conflict of interest → set partner and funding attributes → assign Project ID and launch year → set Linked Programs → register → release to portfolio |
| Outputs | A row in Institute - Research Projects.xlsx; an entry
in the Launch-Year Register; an ethics decision record; a data
management plan; an authorship agreement; a conflict of interest
declaration set; the partner-awareness evidence reference |
| Customers | The investigators; WF-16, WF-17, WF-18, WF-19 and WF-20, all of which read this register rather than rebuilding it; WF-26 and the OBEF submission; MoHESR and the ethics committee under evidence request |
| Success criteria | Every qualifying project is registered before data collection begins; every project has exactly one launch year and appears once in the five-year window; partner attributes are set at registration rather than inferred later; no project is registered that fails the Frascati test, and none is omitted that passes it |
5. Accountability
Process owner. IoL Director of Research, or the role able to require registration before data collection and to resolve disputes about whether an activity qualifies.
| Step | Principal Investigator | Director of Research | Research Administrator | Ethics Committee | Data Protection Officer | Data Steward |
|---|---|---|---|---|---|---|
| Submit the concept note | A/R | I | C | I | I | I |
| Screen against the Frascati criteria | C | A | R | I | I | C |
| Scientific review | R | A | R | I | I | I |
| Ethics review and decision | R | C | R | A/R | C | I |
| Data management plan | A/R | C | C | C | R | C |
| Privacy assessment and retention schedule | R | I | C | C | A/R | I |
| Authorship agreement | A/R | C | I | I | I | I |
| Conflict of interest declarations | R | A | R | C | I | I |
| Set partner type and awareness evidence | R | A | R | I | I | C |
| Set funding amount and partner funding share | R | C | A/R | I | I | C |
| Assign Project ID and launch year | I | C | R | I | I | A/R |
Set Linked Programs |
R | A | C | I | I | R |
| Release to the portfolio | I | A | R | I | I | R |
| Maintain the Launch-Year Register | I | A | C | I | I | R |
Escalation.
| Condition | Escalates to | Within |
|---|---|---|
| Disagreement on whether an activity meets the Frascati criteria | Research Administrator to Director of Research | 5 working days |
| Data collection has begun before ethics approval | Anyone to Director of Research and the Ethics Committee | Immediately, as an integrity matter |
| A partner is proposed whose organisational awareness cannot be evidenced | Research Administrator to Director of Research and WF-24 | Before registration completes |
| Two records appear to describe the same project | Data Steward to Director of Research | Before any submission that uses the register |
| Authorship dispute raised after registration | Principal Investigator to Director of Research | 10 working days |
6. Process steps
Submit the concept note. A short structured note: question, rationale, design, population, partners contemplated, resources, and the programmes the work relates to. One page is enough. The purpose of this step is to catch the project at conception, because everything this workflow captures becomes harder to establish with every month that passes. [CAPTURE] proposer, date of concept, working title. Serves the launch-year determination.
Screen against the Frascati criteria. Apply all five: novel, creative, uncertain in outcome, systematic, transferable or reproducible. Record the screening outcome and its reasoning, not just the verdict. [CAPTURE] Frascati screening decision with reasoning and date. Serves the 4.3 and 5.4 denominator and the 4.4 qualification. Decision point. An activity failing the screen is not registered as a research project and is routed to WF-04 as programme monitoring or service evaluation. An activity passing it must be registered even if it has no partner, no funding and no publication ambition, because it belongs in the denominator. Note for health professions education specifically. Curriculum innovation, assessment instrument development and educational technology evaluation frequently satisfy all five criteria. The Frascati definition's explicit accommodation of creative activity exists for exactly this case. Screen these in on their merits rather than out by habit.
Scientific review. A proportionate internal review of design, feasibility and methodological soundness before the project consumes resource or reaches the ethics committee. Record reviewers, comments and the response. [CAPTURE] review record and date. [IoL to confirm] whether IoL operates its own scientific review panel or relies on the MBRU research office, and what the standing turnaround is.
Ethics review and decision. Submit to the MBRU research ethics committee, or record the formal exemption decision where the activity qualifies for one. No data collection begins before this step closes. [CAPTURE] ethics reference number, decision, decision date, expiry or review date, conditions attached. Exception route. Where a study is exempt or falls below the threshold for full review, the exemption decision itself is the record, and it is recorded with the same discipline as an approval. An undocumented assumption of exemption is the commonest research integrity finding in educational research and is entirely avoidable.
Data management plan. What data will be collected, in what form, where it will live, who has access, how it is backed up, how it is shared with partners, what happens at the end of the project, and who holds it after the investigators have moved on. [CAPTURE] the plan, its version and its owner. This is workflow content in its own right, not an OBEF artefact, and it is the thing most often skipped in small educational studies where the data feels informal until somebody leaves.
Privacy assessment and retention schedule. Where the study involves personal data of students, patients, staff or partners, record the lawful basis, the consent mechanism, the minimisation applied, the retention period and the disposal method. [CAPTURE] privacy assessment reference and retention period. Note the interaction with Appendix B. OBEF evidence provisions permit the Ministry to demand contact data for students counted under KPI 4.4 and for research partners under 4.3 and 5.4. Retention schedules set here must not dispose of data the institution may be required to produce, and consent language must not preclude that disclosure. Settle both at registration.
Authorship agreement. Record the expected author list, the order principle, the criteria to be applied, and the process for resolving change. [CAPTURE] authorship agreement, dated, with the parties recorded. Doing this at conception rather than at submission is the single cheapest dispute-prevention measure available to a research group, and it costs one paragraph.
Conflict of interest declarations. Collected from every investigator, including students, and from partner-affiliated contributors. [CAPTURE] declarations with dates, and any management plan agreed.
Set the partner attributes, which cannot be reconstructed later. For every partner contemplated: identity, type from the approved vocabulary, whether the partner is an industry partner, an international partner, or both, and the reference to the agreement or MoU that evidences the partner organisation's awareness of the collaboration. [CAPTURE]
Industrial partner name,Partner Type,International partner name,International Partner Type,Agreement/MOU Number. Serves 4.3 and 5.4 through WF-17. The awareness test, stated plainly. Working with an individual who happens to be affiliated to an organisation, without that organisation's demonstrable knowledge or approval, does not qualify as a partnership for either KPI. The organisation must be aware of the collaboration. An agreement, an MoU, a countersigned letter or a documented institutional approval is what demonstrates it. A colleague's goodwill is not.Set the funding attributes. Total project budget, funding entity, funding source, and the partner's share of funding where a partner contributes. [CAPTURE]
Funding Amount,Funding Entity,Funding Source,Partner_funding,International_Partner_funding. Serves the 4.3 and 5.4 financial route thresholds, and feeds 3.4 through WF-17 and WF-24. Record the budget even where it is zero or notional. The 4.3 financial route requires a minimum project budget of AED 50,000 and a partner share of at least 20%, and a blank budget field cannot be tested against either.Assign the
Project IDand fix the launch year. One identifier per project, issued once, never reused, never revised. The launch year is the year the project launched and is fixed at registration. [CAPTURE]Project ID, launch year,Fiscal Year,Start Date, plannedEnd Date,Status,Type of Scholarly Activity,Field of R&D,Keywords,Principal Investigator,ORC ID. Serves 4.3, 4.4, 4.5, 5.4 and cross-KPI assertion C6. This is the step the whole workflow exists for. Everything downstream refers to this identifier and this year. A project whose launch year is decided at submission time, three years later, from a start date that was never recorded, is a project that will be counted twice or not at all.Set
Linked Programs. Record every IoL programme the project relates to, using Program Codes. A project linked to several programmes is counted for all of them at programme level, expanded rather than split. [CAPTURE]Linked Programs. Serves programme-level 4.3, 4.4 and 5.4. An unlinked project scores at institution level only. For a channel C4 workflow feeding two programme rows, that is a straightforward and recoverable loss of points, and the field takes ten seconds.Register and release. Write the row to
Institute - Research Projects.xlsxand the entry to the Launch-Year Register, then release the project to the portfolio. [CAPTURE] registration date and the completeness check result. Completeness check before release: Frascati screening recorded; ethics decision or exemption recorded; data management plan lodged; authorship agreement dated; conflicts declared; partner type and awareness evidence set where a partner exists; funding amount present;Project IDunique; launch year fixed;Linked Programspopulated. A project failing the check is not released.Maintain the register through the life of the project.
StatusandEnd Datechange;Project IDand launch year do not. Amendments to ethics approval, changes of principal investigator and the addition of a partner after launch are recorded as amendments against the same record. Decision point. Where a partner joins after launch, the collaboration is still counted in the project's launch year, not in the year the partner joined, because the counting unit is the project. Record the date the partner joined so the decision is visible and reproducible, and refer the treatment to WF-17, which owns the 4.3 and 5.4 numerators.
7. OBEF data generated
| KPI | Data element | Capture point | Captured by | Destination | Level |
|---|---|---|---|---|---|
| 4.3, 5.4 | Project existence and Frascati qualification (the shared denominator) | Steps 2 and 11 | Research Administrator | Institute - Research Projects.xlsx:
Project ID, Project Title,
Type of Scholarly Activity, Status |
Both |
| 4.3, 5.4, 4.5 | Launch year, fixed once | Step 11 | Data Steward | Launch-Year Register;
Institute - Research Projects.xlsx:
Fiscal Year, Start Date |
Both |
| 4.3 | Industry partner identity and type | Step 9 | Principal Investigator via Research Administrator | Institute - Research Projects.xlsx:
Industrial partner name, Partner Type |
Both |
| 4.3 | Partner awareness evidence | Step 9 | Research Administrator | Institute - Research Projects.xlsx:
Agreement/MOU Number; agreement held by WF-24 |
Both |
| 4.3 | Funding amount and partner funding share | Step 10 | Research Administrator | Institute - Research Projects.xlsx:
Funding Amount, Partner_funding,
Funding Entity, Funding Source |
Both |
| 5.4 | International partner identity, type and contribution | Step 9 | Research Administrator | Institute - Research Projects.xlsx:
International partner name,
International Partner Type,
International_Partner_funding |
Both |
| 4.3, 4.4, 5.4 | Programme attribution | Step 12 | Director of Research | Institute - Research Projects.xlsx:
Linked Programs |
Programme |
| 4.4 | Project identity for student-participation linkage | Step 11 | Data Steward | Project ID, consumed by WF-16 and
Students - Research.xlsx |
Both |
| 4.5 | Project identity for impact-unit attribution | Step 11 | Data Steward | Project ID, consumed by WF-19 and
Research Impact.xlsx |
Institution |
| 4.1, 4.2 | Principal investigator identity and ORCID | Step 11 | Research Administrator | Institute - Research Projects.xlsx:
Principal Investigator, ORC ID; consumed by
WF-18 |
Both |
| all | Field of R&D and keywords, for field classification | Step 11 | Principal Investigator | Institute - Research Projects.xlsx:
Field of R&D, Keywords |
Both |
Capture rule. Six attributes cannot be reconstructed
after the fact and must be recorded at registration. The launch
year, because a start date inferred later from a first
publication or a first data file is a guess, and the whole five-year
counting rule rests on it. The partner's identity and
type, because a health-system collaborator recorded as a
free-text name three years on cannot be classified against the approved
partner-type vocabulary. Whether the partner organisation was
aware of the collaboration, because awareness is evidenced by a
document that exists at the time or does not exist at all. The
funding amount and the partner's share, because the 20% and AED
50,000 tests are arithmetic on numbers nobody records retrospectively.
Linked Programs, because the person who
knows which programme the work serves is the investigator, at the moment
of conception. The Frascati screening reasoning,
because a denominator that cannot be justified is a denominator that
will be challenged.
Reproducibility test. With this register in place, a second analyst can construct the 4.3 and 5.4 denominators, apply both qualification routes, and produce identical numerators, working from records alone. Without it, they cannot produce any of them, and the failure is silent: an incomplete project list looks exactly like a small research portfolio. That silence is the specific reason this workflow is worth building before anybody needs its output.
8. Max-score design
This workflow produces no KPI of its own. Its targets are therefore expressed as the conditions the other four KPIs need, and the honest way to read this table is that the register does not score points, it makes points scoreable.
| KPI | Top anchor (scores 100) | Start of High (scores 75) | IoL achievable target | Reasoning |
|---|---|---|---|---|
| 4.3 Joint industry research | 75% of projects | 65% | 45 to 65%, owned by WF-17 | Depends entirely on partner type and contribution being recorded at launch. The register makes the numerator claimable; WF-17 claims it |
| 4.4 Student research participation | 15% of students | 12% | Near 100%, owned by WF-16 | Depends on Project ID and launch year existing so
student participation can be attached to something |
| 4.5 Research impact | 10 units | 8 units | 4 to 8 units, owned by WF-19 | Each impact unit attaches to a Project ID and is
claimed once across five years. Without the register, units cannot be
de-duplicated |
| 5.4 International research collaboration | 80% of projects | 40% | 30 to 50%, owned by WF-17 | Same denominator as 4.3 by construction, which is assertion C2. The register is what makes them identical rather than coincidentally similar |
What this workflow must do to reach the target.
- Register every qualifying project, including the unfunded and unpartnered ones. The temptation runs the other way, because each unpartnered project lowers the 4.3 and 5.4 ratios. Resist it. An understated denominator is a misstatement, it fails assertion C2 the moment the two KPIs are compared, and it will not survive an evidence request that asks for the full project list.
- Fix the launch year at registration and never revise it. This is the single control that satisfies cross-KPI assertion C6, that every project counted in 4.3, 4.5 or 5.4 exists once in the launch-year register.
- Record partner type against the approved vocabulary at the moment the partner is named, not as free text to be classified later. WF-17 depends on this and cannot recover it.
- Record the awareness evidence reference, or record that there is none. A blank field is ambiguous; an explicit "none" is a decision, and it stops a project being claimed on an assumption three years later.
- Populate
Linked Programson every project. Two Program Codes, ten seconds, and the difference between an institution-only claim and a programme-level one on three KPIs. - Screen honestly in both directions. The Frascati criteria admit educational and creative scholarship that IoL habitually does not think of as research, and they exclude routine evaluation that IoL might be tempted to count.
[REDESIGN] actions.
| # | Change | Unlocks | Approver | Lead time |
|---|---|---|---|---|
| R1 | Stand up the IoL Launch-Year Register as a
controlled list, with a unique Project ID, a fixed launch
year, partner attributes, funding attributes and
Linked Programs, populated at registration and never
retrospectively |
The precondition for 4.3 (5.0%), 4.5 (2.0% inst) and 5.4 (2.0%) to be countable once each across a five-year window. It also satisfies cross-KPI assertion C6 | IoL operational decision | Immediate |
| R2 | Make registration a precondition of research
activity: no data collection, no funding drawdown and no
student allocation until a Project ID exists |
Moves capture from voluntary to structural. Voluntary registers decay to about half coverage within a year and the missing half is invisible | Director of Research | One month |
| R3 | Backfill the register for the current five-year window, one row per project, with launch years evidenced by contemporaneous documents rather than recollection, and each backfilled row flagged as backfilled with its evidence | Recovers 4.3, 4.5 and 5.4 for the years already inside the cumulative window. Without it the first submission covers one year of a five-year window | Director of Research with Quality and IQA | Two to three months |
| R4 | Adopt the approved partner-type vocabulary as a closed list in the registration form, with free text disallowed | Makes WF-17's healthcare-institution classification defensible, and prevents the free-text collapse that makes partner type unrecoverable | IoL operational decision | Immediate |
| R5 | Make Linked Programs mandatory at
registration, defaulting to neither programme and requiring an explicit
choice including an explicit "institution only" |
Programme-level attribution on 4.3, 4.4 and 5.4 | IoL operational decision | Immediate |
| R6 | Add a Frascati screening question set to the concept note, with recorded reasoning | Defends the denominator, and captures educational and creative scholarship that currently goes unregistered because it does not look like research | Director of Research | One month |
Sequencing note. R3 is the action with a deadline attached that nobody has set. The 4.3, 4.5 and 5.4 windows are five years cumulative, so every year that passes without a backfill permanently removes a year of countable projects from the first submission that uses the register. The evidence needed for a backfill also decays: ethics approvals, agreements and award letters from four years ago are findable now and will be harder each year. R1 and R2 protect the future; R3 is the only action that recovers the past.
9. Indirect strategy where data cannot be collected
Category 4, the activity exists but is invisible, and this workflow is the archetype of it.
IoL undertakes scholarly activity. Curriculum evaluation, assessment design research, educational technology studies, health professions education scholarship with health-system colleagues, supervision of student projects: it happens, and much of it meets the Frascati criteria on any honest reading. None of it counts towards KPI 4.3, 4.5 or 5.4 unless it exists as a registered project with a launch year, a partner type and a programme linkage. The response to Category 4 is capture, not tactics. There is no argument to be constructed here and no interpretive latitude to exploit. There is a register, and either it exists or the points do not.
Where a genuine interpretive judgement does arise, it is the Frascati screen, and it runs both ways. The five criteria are a definition, not a hurdle, and the guide's explicit statement that creative activities count in disciplines where traditional research is not the primary form of scholarly activity is a deliberate accommodation for fields exactly like health professions education. Applying it is legitimate. Stretching it to cover routine curriculum administration is not. The safeguard is the recorded reasoning at step 2: a screening decision with its rationale can be reviewed and, if wrong, corrected. A screening decision with no rationale is indistinguishable from a preference.
A second-order point about the denominator that is worth stating explicitly. Because 4.3 and 5.4 divide by total research projects, there is a structural incentive to register fewer projects. Anyone reading the formulae will notice it. It is worth naming inside the workflow rather than leaving it to be discovered privately, because an unnamed incentive is the one that operates. Three things close it off: the denominator is evidenced and can be requested under Appendix B; assertion C2 compares the two denominators against each other; and an understated project count also understates KPI 4.1's activity base and IoL's own account of what it does. The correct response to a low ratio is to register more collaborations, which is WF-17's job, not to register fewer projects.
Ambiguities in the guide, stated rather than resolved.
- What "launch year" means for a project with a long
gestation. The counting rule says a collaboration is counted
once in the year it launched, but "launched" is not defined against a
specific event: concept, ethics approval, funding award, first data
collection and formal start date can span two or three years.
Choose one definition, record it in the register's own
documentation and in the
Mechanism of collecting the datafield, and hold it constant. IoL's working assumption, stated as an assumption: the launch year is the year of the recordedStart Date, which is the date from which work was authorised to proceed. Confirm with MoHESR. - How a partner joining after launch is treated. The project is counted once in its launch year, so a partner joining in year three either qualifies the project retrospectively in its launch year or does not qualify it at all. The guide does not say. The register records the date the partner joined so the choice is visible; the choice itself belongs to WF-17 and to a written question to MoHESR.
- Whether a project with no external partner belongs in the denominator. On the plain reading of "total research projects", yes. Nothing in the guide restricts the denominator to partnered projects. It is worth noting because the alternative reading would be materially more favourable, which is exactly why it should not be adopted without an answer.
- The status of creative and developmental educational work. The Frascati accommodation is real but its boundary is not drawn. A new assessment instrument developed systematically, evaluated and published is plainly in. A revised course handbook is plainly out. The space between them is where the screening reasoning earns its keep.
Boundary check. This workflow must never:
- register an activity as a research project where the Frascati screen was not applied, or was applied and failed;
- omit a qualifying project from the register because it has no partner and would lower the 4.3 or 5.4 ratio;
- assign or revise a launch year retrospectively to move a project into a more advantageous year of the five-year window;
- record a partner organisation as aware of a collaboration without an agreement, MoU or documented institutional approval to evidence it;
- record a partner type that the approved vocabulary does not support, or classify an organisation by what would be convenient rather than what it is;
- allow data collection to begin before the ethics decision or documented exemption is recorded;
- backfill a launch year from recollection rather than from a contemporaneous document, or fail to flag a backfilled row as backfilled;
- create a second record for a project that already exists in order to resolve a reporting inconvenience.
10. Service standards
| Service | Standard |
|---|---|
| Concept note acknowledged | 3 working days |
| Frascati screening decision returned with reasoning | 5 working days of concept note |
| Scientific review completed | 15 working days of a complete submission |
| Ethics submission prepared and lodged after scientific review | 10 working days |
| Ethics decision recorded in the register after receipt | 3 working days |
| Data management plan lodged | Before ethics submission |
| Authorship agreement recorded | Before registration completes |
| Conflict of interest declarations collected | Before registration completes |
Project ID and launch year assigned |
Within 5 working days of a complete registration pack |
Linked Programs populated |
100% of registered projects, no exceptions |
| Partner type and awareness evidence recorded | At registration, before release |
| Register completeness check run | Before every release and before every OBEF submission |
| Status and end date maintained | Reviewed at least annually per project |
11. Records and evidence
| Record | Retention | Owner | Appendix B exposure |
|---|---|---|---|
| Launch-Year Register | Permanent | Data Steward | Yes, indirectly and unavoidably. It is the evidence that projects counted in 4.3, 4.5 and 5.4 were counted once |
| Project registration record with all attributes | Permanent | Research Administrator | Yes |
| Frascati screening decision with reasoning | Permanent | Research Administrator | Yes, as the justification for the denominator |
| Ethics application, decision and conditions | Per MBRU ethics policy, minimum 7 years after project close | Ethics Committee, copy to IoL | Not an OBEF artefact, but demandable under research governance review |
| Data management plan | Life of the data plus the retention period | Principal Investigator | No for OBEF; yes under data protection enquiry |
| Privacy assessment and retention schedule | Permanent | Data Protection Officer | No for OBEF; yes under data protection enquiry |
| Authorship agreement | Life of the project plus 7 years | Principal Investigator | No |
| Conflict of interest declarations | 7 years | Director of Research | No for OBEF; yes under research integrity review |
| Partner agreement or MoU reference, with the agreement held by WF-24 | Life of agreement plus 7 years | Partnerships Office | Yes. Partnership documents with industry and international partners are named in Appendix B for 4.3 and 5.4 |
| Funding award letters and budget records | 7 years | Research Administrator | Yes. Proof of financial contribution is named for the 4.3 and 5.4 financial routes |
| Backfill evidence pack, where R3 is executed | Permanent | Director of Research | Yes, and it is what distinguishes a reconstructed register from an invented one |
Appendix B readiness. The Ministry can demand partnership documents, proof of financial and intellectual contribution, and contact data for industry and international partners, and it can do so without notice. Today IoL would be assembling that from individual investigators' files and memories, which is neither fast nor complete. With the register operating, the answer to every such request is a filtered extract plus the referenced documents, and 15 working days is comfortable rather than tight. [IoL to confirm] where research agreements are currently held and whether a single index of them exists.
12. Risks and controls
| # | Risk | Consequence | Control | Owner |
|---|---|---|---|---|
| 1 | No launch-year register | Projects double counted or under counted across the five-year window, with no way to tell which | Action R1, plus assertion C6 run before every submission | Data Steward |
| 2 | Registration is voluntary in practice | Coverage decays, and the missing projects are invisible because absence looks like a small portfolio | Action R2: registration gates data collection, funding drawdown and student allocation | Director of Research |
| 3 | Launch year inferred at submission time | Wrong year, and a project pushed into or out of the window | Launch year fixed at registration from a contemporaneous
Start Date |
Data Steward |
| 4 | Partner recorded as free text | Partner type unrecoverable, so WF-17 cannot claim 4.3 or 5.4 | Closed vocabulary at entry, action R4 | Research Administrator |
| 5 | Partner awareness assumed rather than evidenced | An unsupportable claim on 4.3 or 5.4, discovered under evidence request | Agreement/MOU Number recorded, or an explicit
"none" |
Research Administrator |
| 6 | Linked Programs left blank |
Institution-level claim only; programme-level points lost on three KPIs | Mandatory field with an explicit institution-only option, action R5 | Director of Research |
| 7 | Denominator understated to raise the 4.3 and 5.4 ratios | Misstatement; fails assertion C2; fails an evidence request for the project list | Frascati screen applied to every concept with recorded reasoning; register reviewed by Quality and IQA | Quality and IQA |
| 8 | Data collection before ethics approval | Research integrity finding; the data may be unusable and the project unpublishable | Step 4 hard stop; escalation route | Director of Research |
| 9 | Duplicate records for one project | Double counting inside the five-year window | Unique Project ID, duplicate check at release and
before submission |
Data Steward |
| 10 | Backfilled rows indistinguishable from contemporaneous ones | The whole register's credibility falls with the weakest row | Backfill flag with an evidence reference on every backfilled row | Director of Research |
| 11 | Retention schedule disposes of data the Ministry may demand | Appendix B failure caused by a compliant-looking privacy decision | Retention schedule tested against Appendix B exposure at step 6 | Data Protection Officer |
| 12 | Principal investigator leaves and the project record follows them | Orphaned project, no evidence, no closure | Register is institutional, not personal; ownership reassigned at status review | Director of Research |
13. Performance measures
| Dimension | Measure | Target |
|---|---|---|
| Capture completeness | Qualifying projects registered before data collection began | 100% |
| Capture completeness | Registered projects with a fixed launch year evidenced by a contemporaneous document | 100% |
| Capture completeness | Registered projects with Linked Programs populated |
100% |
| Capture completeness | Partnered projects with partner type from the closed vocabulary and an awareness evidence reference | 100% |
| Capture completeness | Five-year window backfilled | 100% of identifiable projects, with backfill flags |
| Integrity | Projects appearing more than once in the Launch-Year Register | Zero |
| Integrity | Frascati screening decisions recorded with reasoning | 100% |
| Integrity | Data collection commencing before an ethics decision | Zero |
| Timeliness | Concept to Project ID elapsed time |
30 working days or fewer |
| Timeliness | Ethics decisions recorded within 3 working days of receipt | 95% |
| Consistency | 4.3 denominator equals 5.4 denominator (assertion C2) | Exact match, every submission |
| Consistency | Every project counted in 4.3, 4.5 or 5.4 exists once in the register (assertion C6) | Exact match, every submission |
| Reproducibility | A second analyst can build the 4.3 and 5.4 denominators from the register alone | Yes |
The first five measures are the workflow. Everything else in this document is scaffolding around them, and a research portfolio can be genuinely productive while scoring nothing on three KPIs if those five measures sit at zero.
14. Change control
| Date | Version | Change | Reason | Approved by |
|---|---|---|---|---|
| 2026-09-02 | 0.1 | Initial draft | IoL OBEF pilot | draft, unapproved |