AW-21 · Event Logistics and Vendor Management

Primary KPIsnone
Contributes to
TriggerAn event brief from the Event Organiser with a budget line confirmed, after WF-23 has run its qualification check where the event is intended to count
EndpointAll vendors settled and reconciled through AW-12 and AW-11, attendance and feedback handed to WF-23, and the event file closed
OBEF touchpoint**Attendance evidence.** The sign-in and attendance record produced at the event is the proof of attendance WF-23 needs for KPI 6.1 and 6.2, and Appendix B allows the Ministry to demand attendee names. Attendance is captured at the event, never estimated afterwards, and handed to WF-23 within 10 working days

BPMN 2.0 (ISO/IEC 19510), generated from the procedure section of this document. Lanes are the roles in the RACI; a cylinder marks a capture point and the KPI it feeds; a diamond is a decision point. Click a task to jump to its step. Scroll to zoom, drag to pan.

AW-21 — Event Logistics and Vendor Management

Workflow ID AW-21
Pack owner IoL Administrative Affairs (decision of 2 September 2026; see Architecture/04_Ownership_Model.md)
Family M — Communications, events and relationships
Ownership IoL. Venue, procurement, payment and branding each pass through the MBRU process that owns them (AW-14, AW-10, AW-11, AW-12, AW-22); IoL owns the event plan, the vendors' coordination, the day itself and the attendance record [IoL to confirm]
Governing policy MBRU events, hospitality and procurement policies; MBRU brand guidelines; Dubai Health event and media approvals where applicable; MBRU data protection policy [IoL to confirm]; ISO 9001:2015 clauses 8.1 and 8.4
Interfaces WF-23 event lifecycle (qualification and OBEF register); AW-14 space; AW-10 procurement; AW-11 payments and travel; AW-12 revenue; AW-16 data protection; AW-17 safety; AW-19 accessibility; AW-22 brand
OBEF touchpoint Attendance evidence. The sign-in and attendance record produced at the event is the proof of attendance WF-23 needs for KPI 6.1 and 6.2, and Appendix B allows the Ministry to demand attendee names. Attendance is captured at the event, never estimated afterwards, and handed to WF-23 within 10 working days
Process owner ______________
Version 0.1 draft
Effective
Next review

1. Purpose and scope

Purpose. To deliver IoL events safely, on budget and through the institution's approved routes for space, purchasing, payment, branding and personal data, and to leave behind a named attendance record captured on the day. The consequential point is the last one: an event that ran well but whose attendance was estimated afterwards is worth nothing to WF-23 and cannot be defended to the Ministry.

Scope statement. This procedure manages the logistics of an IoL event from the confirmed brief to post-event settlement and the handover of attendance and feedback.

Applies to. Conferences, symposia, workshops, public lectures, community and volunteering events, CPD events, ceremonies and internal events with external vendors, on campus, at a Dubai Health site, at an external venue or online.

Does not apply to. The decision whether an event qualifies for OBEF, its classification and its register row, which are WF-23; the academic or CPD content and speaker selection, which belong to the organising workflow (WF-21, WF-23); routine teaching sessions booked through AW-14 with no vendor.

2. Trigger, boundary and interfaces

Trigger An event brief from the Event Organiser with a budget line confirmed, after WF-23 has run its qualification check where the event is intended to count
Endpoint All vendors settled and reconciled through AW-12 and AW-11, attendance and feedback handed to WF-23, and the event file closed
Upstream WF-23 (qualification, type, audience, expected attendance); AW-02 (budget); AW-22 (brand and comms plan)
Downstream WF-23 (attendance record, feedback, evidence pack items); AW-12 (income); AW-11 (payments); AW-13 (any equipment); AW-17 (any incident)
Handoff to the academic pack WF-23 decides whether an event qualifies and registers it; AW-21 runs it. AW-21 hands WF-23 the signed attendance record with names, the counting method where names could not be captured, the promotional material and the feedback summary, within 10 working days of the event

3. Roles and accountability

Process owner. IoL Events Coordinator or equivalent [IoL to confirm].

Step Event Organiser Events Coordinator Budget Holder MBRU Procurement (AW-10) AW-22 Communications WF-23 Data Steward
Confirm the brief, budget and qualification status R R A I I C
Book venue and space through AW-14 I A/R I I I I
Procure AV, catering and services through AW-10 C R A R I I
Set up registration with a privacy notice C A/R I I C I
Arrange speaker travel and honoraria through AW-11 R R A I I I
Obtain licensing and venue approvals I A/R I I C I
Signage and branding C R I I A I
Run sheet and on-the-day delivery C A/R I I I I
Capture sign-in and attendance R A/R I I I I
Hand attendance and feedback to WF-23 I A/R I I I C
Settle and reconcile through AW-12 and AW-11 I R A I I I

[CONTROL] Segregation. The Events Coordinator does not approve vendor spend or receive registration income; approval follows AW-05 and money follows AW-12. The attendance record is captured by a named person at the event and is not altered after the day; any correction is a separate dated note.

4. Procedure

  1. Confirm the brief. The Event Organiser supplies date, format, audience, expected attendance, accessibility needs (AW-19 requests received at registration), budget line and, where the event is intended to count, the WF-23 qualification outcome with type and minimum attendance. [CONTROL] No vendor is engaged before the Budget Holder confirms the budget.

  2. Book space through AW-14. Room, capacity, layout, AV baseline and access hours. External venue terms beyond a standard booking go through AW-23.

  3. Procure through AW-10. AV, catering, printing, transport and other services are requisitioned in the procurement system at the AW-05 level for the value. [CONTROL] Verbal orders to vendors are not IoL orders. Sponsored or in-kind provision is recorded at receipt with its valuation basis for WF-24, as AW-10 requires.

  4. Open registration. The registration platform [IoL to confirm] collects the minimum data needed: name, affiliation, email, learner status where the event must be open to students, and accessibility requirements. The form carries a privacy notice approved under AW-16 stating that attendance will be recorded and may be reported to the Ministry by name. [CONTROL] No registration list is held outside the platform or exported to personal devices.

  5. Arrange speakers. Travel, accommodation and honoraria follow AW-11, with the engagement letter on file before travel is booked; no other payment route exists.

  6. Obtain approvals. Where the event is public, involves media, filming, external branding or a Dubai Health site, the Coordinator obtains and files the required MBRU or Dubai Health approvals [IoL to confirm which]; AW-22 handles the media and branding route. An AW-17 safety check is completed for any layout beyond the venue standard.

  7. Signage and branding through AW-22. All visible material uses MBRU and Dubai Health branding as approved by AW-22; partner logos appear only where the agreement (AW-23) permits.

  8. Issue the run sheet. Timings, roles, vendor contacts, AV cues, sign-in staffing, accessibility arrangements and the incident contact, issued to all event staff 2 working days before.

  9. Capture attendance at the event. [CONTROL] Sign-in by registration scan, QR code, signed sheet or platform export, with names, captured at the event by the named person on the run sheet. The count is taken from the sign-in record, not from registrations or the room. Where names genuinely cannot be captured (an open public stand), the counting method, counter and count are recorded as WF-23's exception route requires. Attendee lists are personal data under AW-16.

  10. Collect feedback. The feedback instrument agreed with the Organiser is issued at or within 2 working days of the event; the summary goes to WF-23 with the attendance record.

  11. Hand over to WF-23. Within 10 working days: the attendance record, the counting method note where used, the promotional material, the approvals and the feedback summary. [CONTROL] The Coordinator confirms the handover in the event file; WF-23 closes its register row.

  12. Settle and reconcile. Vendor invoices are matched under AW-10 and paid under AW-11; registration income and sponsorship are received and reconciled under AW-12 against the registration platform. The Coordinator closes the event file with the final cost against budget.

Exception routes. Cancellation or postponement: the Coordinator notifies vendors within the contract terms, registrants the same day, and WF-23 so the register row is flagged. On-the-day vendor failure: the Coordinator may authorise a replacement up to the AW-05 emergency limit [IoL to confirm] with the requisition raised within 2 working days. Incident at the event: AW-17 takes precedence.

5. Service standards

Service Standard
Brief confirmed and budget checked 5 working days from receipt
Venue booked Within 5 working days of brief confirmation, subject to AW-14 availability
Registration open with privacy notice At least 15 working days before the event [IoL to confirm]
Run sheet issued 2 working days before
Attendance record captured At the event, same day
Feedback issued Within 2 working days after
Attendance and feedback handed to WF-23 10 working days after
Vendor invoices released for matching 10 working days after receipt of invoice
Event file closed with cost against budget 30 working days after

6. Records, retention and controls

Record System Retention Owner
Event file: brief, budget, approvals, run sheet, cost report Events folder [IoL to confirm] 7 years Events Coordinator
Registration data Registration platform Per AW-16, minimum needed for the evidence period Events Coordinator
Attendance record with names, or counting-method note Event file, copy to WF-23 evidence pack Per WF-23, at least the OBEF evidence window Events Coordinator
Vendor requisitions, orders, goods-received notes MBRU procurement system 7 years Budget Holder
Speaker agreements and claims AW-11 records 7 years Budget Holder
Income and reconciliation AW-12 records 7 years MBRU Finance
Feedback summary Event file, copy to WF-23 Per WF-23 Event Organiser

Key controls. (1) No vendor engaged before budget confirmation. (2) All purchasing through AW-10 and all payment through AW-11; the Coordinator approves neither. (3) Registration collects the minimum data under an approved privacy notice. (4) Attendance is captured at the event by a named person and is not altered afterwards. (5) Handover to WF-23 within 10 working days, confirmed in the file. (6) Income only through AW-12.

OBEF touchpoint capture rule. The attendance record is created on the day, from sign-in, with names, by the person named on the run sheet, and handed to WF-23 within 10 working days. It is never reconstructed from registrations, photographs or memory; Appendix B lets the Ministry ask for names, and the record must be able to answer.

7. Performance measures

Dimension Measure Target
Timeliness Attendance records handed to WF-23 within 10 working days 95%
Timeliness Event files closed within 30 working days 90%
Compliance Events with a same-day named attendance record or a counting-method note 100%
Compliance Vendor spend with a requisition before commitment 100%
Accuracy Final cost within 10% of approved budget 90%
Experience Attendee feedback, share rating logistics good or better 85%
Touchpoint Counted events for which WF-23 requested a correction to attendance 0

8. Change control

Date Version Change Reason Approved by
2026-09-02 0.1 Initial draft IoL administrative pack draft, unapproved