AW-14 — Space and Facilities Operations: Booking, Timetabling Logistics, Maintenance and Readiness
| Workflow ID | AW-14 |
| Pack owner | IoL Administrative Affairs (decision of 2 September 2026; see Architecture/04_Ownership_Model.md) |
| Family | K — Facilities, IT, data protection, safety |
| Ownership | IoL for the simulation centre, the clinical skills rooms and the
teaching, meeting and storage spaces allocated to IoL; Slice of MBRU
facilities management for maintenance, cleaning contracts, building
systems and physical security [IoL to confirm] |
| Governing policy | MBRU facilities management, room booking and access control policies
[IoL to confirm]; ISO 9001:2015 clauses 7.1.3 and 7.1.4;
ISO 21001:2018 clauses 7.1.3 and 7.1.4 |
| Interfaces | WF-12 simulation readiness; AW-21 events; AW-17 safety; AW-13 assets; AW-12 external hire income; AW-10 purchasing; AW-15 AV and IT faults; AW-07 access on leaving |
| OBEF touchpoint | None |
| Process owner | ______________ |
| Version | 0.1 draft |
| Effective | |
| Next review |
1. Purpose and scope
Purpose. To ensure that IoL's teaching, assessment, simulation and meeting spaces are allocated by a published priority rule, set up to a stated standard, confirmed ready before learners arrive, maintained through MBRU's facilities function, and used at a rate the department can see and defend.
Scope statement. This procedure manages IoL-controlled space from the receipt of a timetable block or booking request to the close of the session, its turnaround and the monthly utilisation report, together with IoL's part of maintenance, cleaning, consumables, access control and external hire.
Applies to. The simulation centre, clinical skills rooms, IoL seminar and meeting rooms, preparation and storage areas, and their fixed AV; every category of use from timetabled teaching to external hire.
Does not apply to. MBRU-wide lecture theatres and central rooms, which IoL books through the institutional system like any other department; execution of maintenance, cleaning contracts and security staffing, which are MBRU's; readiness of simulation equipment, scenarios and consumables, which is WF-12; event content, which is WF-23; asset custody, which is AW-13.
2. Trigger, boundary and interfaces
| Trigger | The term timetable block; an ad hoc booking request; a fault or hazard observed in a space; an external hire enquiry |
| Endpoint | Session delivered in a room confirmed ready, turned around and released; fault closed and signed off; external hire invoiced through AW-12; monthly utilisation report issued |
| Upstream | Academic timetabling; WF-21 CPD schedule; AW-21 event plans; WF-12 simulation requirements; AW-13 equipment location |
| Downstream | AW-17 hazards and incidents; AW-13 damage and loss; AW-12 hire charging; AW-15 AV and IT faults; AW-02 and AW-25 utilisation and capacity; AW-06 building-failure continuity |
| Handoff to the academic pack | WF-12 receives a room confirmed ready at building level (power, climate, water, AV, cleanliness, access). WF-12 owns everything inside the simulation. The boundary is the room door, and the two checklists are signed separately. |
3. Roles and accountability
Process owner. IoL Operations Manager or equivalent
[IoL to confirm].
| Step | Requester | Booking Coordinator | Simulation Centre Manager | Process Owner | MBRU Facilities | Finance (AW-12) |
|---|---|---|---|---|---|---|
| Load the term timetable block and freeze it | C | A/R | C | I | I | I |
| Accept or decline an ad hoc booking | R | A/R | C | I | I | I |
| Resolve a booking conflict or displacement | I | R | C | A | I | I |
| Confirm building-level readiness before a session | I | A/R | C | I | I | I |
| Confirm simulation readiness (WF-12) | I | I | A/R | I | I | I |
| Raise, track and sign off a maintenance request | R | R | C | A | R | I |
| Authorise after-hours use | R | I | C | A | I | I |
| Approve an external hire | I | R | C | A | I | C |
| Raise the invoice for external hire | I | R | I | I | I | A/R |
[CONTROL] Segregation. The person who approves an external hire does not raise the invoice or handle any payment; charging is AW-12's alone and no cash or card is taken by IoL staff. After-hours access is authorised by the process owner, never by the user. Completed maintenance is signed off by the IoL person who raised the request, not by the contractor and not by Facilities alone.
4. Procedure
Publish the priority rule. Space is allocated in this order: (1) timetabled teaching and assessment for accredited programmes; (2) assessment requiring secure conditions, including OSCEs and resits; (3) CPD and CME under WF-21; (4) research activity and internal meetings; (5) events under AW-21; (6) external hire. A lower-priority booking may be displaced only with notice of at least
[IoL to confirm, assumed 10 working days], except in an emergency. [CONTROL] Every displacement is recorded with the reason and the alternative offered.Load and freeze the term timetable. Before each term, the Booking Coordinator loads the teaching and assessment block into the booking system
[IoL to confirm system]and sets a freeze date. After the freeze, timetable changes are conflicts and follow step 4. Assessment bookings carry restricted visibility.Take ad hoc bookings only in the system. Every booking states purpose and category, numbers, layout, AV and equipment, any hazardous materials or activities (routed to AW-17), times inclusive of set-up and turnaround, and the cost centre where chargeable. [CONTROL] A room is not booked by email, message or conversation.
Resolve conflicts. The Booking Coordinator applies the priority rule; between bookings of equal priority the earlier confirmed booking stands. Decision point. Where the rule does not settle it, the process owner decides within 2 working days and the decision is recorded against both bookings.
Set up to standard. Each room has a standard layout, a set-up checklist and a minimum turnaround
[IoL to confirm, assumed 30 minutes for seminar rooms and 60 minutes for simulation and clinical skills rooms].Confirm readiness before teaching and assessment. Before every session the Booking Coordinator or delegate signs the readiness checklist: access, layout, AV, lighting, temperature, cleanliness, signage, consumables and the safety items AW-17 requires for the room type. For simulation and clinical skills sessions this covers building services only and is handed to WF-12 at the door. [CONTROL] For assessments, readiness is confirmed no later than
[IoL to confirm, assumed 60 minutes]before the start; a failed item is escalated to the process owner and the assessment lead immediately.Report faults and track maintenance. Faults are raised to MBRU Facilities through its service system on the day observed, and the reference, date, priority and status are entered in the IoL maintenance log. AV and IT faults go to AW-15. A fault that makes a space unsafe withdraws it from booking and is reported under AW-17 the same day. [CONTROL] Completed work is signed off in the log by the IoL person who raised it, after inspection.
Cleaning and consumables. Cleaning follows the MBRU schedule; IoL records checks and requests additional cleans after simulation fluids or moulage. Consumables are held to a reorder point and replenished through AW-10; simulated medications and sharps are stored and disposed of under AW-17.
Control access and after-hours use. Access rights are issued by MBRU Security on the process owner's request and held in an IoL access register naming every card, key and code holder. After-hours use requires the process owner's authorisation, a named responsible person on site, and the lone-working rules in AW-17. [CONTROL] The register is reconciled quarterly against AW-07 and AW-08 leavers and the AW-15 access review; a leaver's physical access ends on the last working day.
External hire. Enquiries are assessed against the priority rule, the rate card
[IoL to confirm]and the standard hire terms held by AW-23. The hirer signs the booking form and terms, provides insurance evidence where required, and receives the AW-17 safety briefing. [CONTROL] No external use begins without signed terms and the process owner's approval; the fee is raised only through an AW-12 invoicing request.Close the session. The room is restored, consumables used are noted, damage or loss goes to AW-13, and any incident or near-miss to AW-17. No-shows and late cancellations are recorded.
Report utilisation. Monthly, the process owner issues booked hours against available hours by room, no-shows, cancellations and displacements. The report goes quarterly to AW-25 and feeds AW-02 capacity planning.
Exception routes. Emergency displacement (safety, building failure, institutional instruction): the process owner may cancel any booking, notifies the requester the same day and seeks an alternative; building loss beyond one day invokes AW-06. Three no-shows in a term: future bookings from that requester need the process owner's confirmation.
5. Service standards
| Service | Standard |
|---|---|
| Ad hoc booking confirmed or declined | 2 working days |
| Conflict decision by the process owner | 2 working days |
| Readiness check completed and signed | Before every teaching and assessment session |
| Fault raised to MBRU Facilities | Same day as observed |
| Open maintenance request chased | At the MBRU service standard, and at 10 working days at latest |
| Completed maintenance signed off | 2 working days of notification |
| Utilisation report issued | By the 10th working day of the following month |
6. Records, retention and controls
| Record | System | Retention | Owner |
|---|---|---|---|
| Bookings, changes, displacements and decisions | Booking system | 3 years | Booking Coordinator |
| Readiness checklists | Booking system or IoL operations log | 3 years; assessment readiness with the assessment record per AW-04 | Booking Coordinator |
| Maintenance log with MBRU references and sign-off | IoL operations log | 5 years | Process owner |
| Access register and after-hours authorisations | IoL operations log | 5 years after access ends | Process owner |
| External hire forms, terms and approvals | IoL operations log and AW-12 | 7 years | Process owner |
Key controls. (1) No space is booked outside the system. (2) Every displacement carries a reason and an alternative. (3) Every teaching and assessment session has a signed readiness checklist. (4) Every fault has an MBRU reference and an IoL sign-off. (5) The access register reconciles to leavers each quarter. (6) External hire has signed terms before use, and its fee passes only through AW-12.
OBEF touchpoint. None.
7. Performance measures
| Dimension | Measure | Target |
|---|---|---|
| Timeliness | Ad hoc bookings confirmed within 2 working days | 95% |
| Compliance | Teaching and assessment sessions with a signed readiness checklist | 100% |
| Compliance | Displacements recorded with reason and alternative | 100% |
| Accuracy | Access register reconciliation exceptions unresolved after 10 working days | 0 |
| Utilisation | Booked hours as a share of available hours, by room | Tracked; target set after baseline |
| Experience | Faculty and learner rating of room readiness, from WF-06 and the staff pulse | Tracked, improving |
8. Change control
| Date | Version | Change | Reason | Approved by |
|---|---|---|---|---|
| 2026-09-02 | 0.1 | Initial draft | IoL administrative pack | draft, unapproved |