AW-25 · Management Review and External Reporting Calendar

Primary KPIsnone
Contributes to
TriggerThe management review date on the AW-01 calendar; a due date on the external reporting calendar; a change in an external requirement; a request from the Senior Director, IoL, or MBRU
EndpointManagement review minuted with decisions, actions and resource needs tracked through AW-01 and AW-02; every calendar obligation evidenced as fulfilled or formally deferred
OBEF touchpointNone directly. The OBEF and CHEDS cycle appears as one row in the external reporting calendar, cross-referenced to WF-26, which owns it

BPMN 2.0 (ISO/IEC 19510), generated from the procedure section of this document. Lanes are the roles in the RACI; a cylinder marks a capture point and the KPI it feeds; a diamond is a decision point. Click a task to jump to its step. Scroll to zoom, drag to pan.

AW-25 — Management Review and External Reporting Calendar

Workflow ID AW-25
Pack owner IoL Administrative Affairs (decision of 2 September 2026; see Architecture/04_Ownership_Model.md)
Family N — Quality and compliance
Ownership IoL. MBRU owns institutional management review and every submission made in MBRU's name; IoL owns its departmental management review and the calendar of obligations for which IoL prepares the content [IoL to confirm]
Governing policy MBRU quality assurance framework [IoL to confirm]; ISO 9001:2015 clause 9.3; ISO 21001:2018 clause 9.3
Interfaces AW-24 audit and CAPA; AW-06 risk; AW-01 minutes; AW-02 resources and objectives; AW-03 document status; every AW and WF for performance measures; WF-05 accreditation; WF-26 OBEF and CHEDS submission windows; WF-21 CME accreditation
OBEF touchpoint None directly. The OBEF and CHEDS cycle appears as one row in the external reporting calendar, cross-referenced to WF-26, which owns it
Process owner ______________
Version 0.1 draft
Effective
Next review

1. Purpose and scope

Purpose. To ensure that IoL's leadership reviews the whole management system at least annually on the evidence ISO 9.3 requires, decides what will change and what resources it needs, and records those decisions where they can be tracked; and that every recurring obligation to an external body is known, owned, dated, sourced and evidenced in one calendar.

Scope statement. This procedure manages the departmental management review from the collection of inputs to the tracking of outputs, and the external reporting calendar from the identification of an obligation to the evidencing of its fulfilment.

Applies to. The annual management review and any interim review the Senior Director, IoL, calls; every recurring obligation to a regulator, accreditor, ministry, certification body or Dubai Health function for which IoL prepares content, whether IoL or MBRU submits it.

Does not apply to. MBRU's institutional management review, to which this review is an input; the content of any submission, which belongs to the producing procedure (WF-26, WF-05, WF-21); one-off requests, which follow AW-04.

2. Trigger, boundary and interfaces

Trigger The management review date on the AW-01 calendar; a due date on the external reporting calendar; a change in an external requirement; a request from the Senior Director, IoL, or MBRU
Endpoint Management review minuted with decisions, actions and resource needs tracked through AW-01 and AW-02; every calendar obligation evidenced as fulfilled or formally deferred
Upstream AW-24 (audit results, CAPA status); AW-06 (risk register); AW-02 (objectives, resources); AW-03 (document status); AW-20 and WF-06 (feedback); every procedure's performance measures; external bodies' requirement changes
Downstream AW-01 (minutes and actions); AW-02 (resource needs into the next plan); AW-03 (changes to the system); AW-06 (new risks); AW-24 (audit programme priorities); the producing procedure for each calendar row
Handoff to the academic pack WF-26 owns the OBEF and CHEDS submission; this calendar holds its window, owner and evidence location as one row and issues the reminders. WF-05 and WF-21 likewise own theirs. The boundary is the reminder: this procedure ensures the deadline is known; the producing workflow meets it.

3. Roles and accountability

Process owner. IoL Quality Lead or equivalent [IoL to confirm], with authority to place any item on the management review agenda.

Step Process owner (Quality Lead) Input owners (procedure owners) Senior Director, IoL IoL management committee (AW-01) Calendar row owner MBRU submitting function
Schedule the review A/R I C I I I
Compile the input pack A/R R I I I I
Conduct the review and decide R C A R I I
Minute and track outputs R I A R I I
Report to MBRU institutional review R I A/R I I I
Maintain the external reporting calendar A/R C I I R I
Prepare a return I I I I A/R C
Approve a return for submission I I A/R I R I
Submit in MBRU's name I I I I R A
Evidence fulfilment R I I I A/R I

[CONTROL] Segregation. Input owners supply their own measures; the process owner does not restate them. A return is prepared by its row owner and approved by the Senior Director, IoL, before submission. Decisions are taken by the committee, not by the process owner who compiled the pack.

4. Procedure

Part A. Management review

  1. Schedule. The review is a standing item on the AW-01 calendar, at least annually and timed so that its outputs feed the AW-02 planning call, chaired by the Senior Director, IoL, and minuted under AW-01. [CONTROL] A year without a minuted management review is a major non-conformity under AW-24.

  2. Call for inputs. Twenty working days before the review the process owner requests each input from its owner in a standard template. The required inputs are:

    Input (ISO 9.3.2) Source
    Status of actions from the previous review AW-01 action register
    Changes in external and internal issues relevant to the system Senior Director, IoL; AW-03 external documents register; this calendar
    Performance and effectiveness: every procedure's section 7 or 13 measures against target Each AW and WF owner
    Customer and stakeholder satisfaction and feedback WF-06, WF-14, AW-20, AW-18, AW-22
    Extent to which objectives were met AW-02 register of objectives
    Process performance and conformity of services AW-24 audit results; service standards attainment
    Non-conformities and corrective actions AW-24 CAPA register
    Monitoring and measurement results AW-25 calendar fulfilment; WF-26 submission outcome
    Audit results, internal and external AW-24; WF-05; ISO certification body
    Performance of external providers AW-10, AW-11, AW-23 supplier and partner performance
    Adequacy of resources AW-02 outturn; AW-07 vacancies; AW-13 and AW-14 condition
    Effectiveness of actions to address risks and opportunities AW-06 register and continuity test results
    Opportunities for improvement Any owner; AW-24 observations

    [CONTROL] An input reported as "no change" is accepted only with the owner's signature and the date of the data it rests on.

  3. Compile and circulate the pack. The process owner flags every measure below target, overdue action and risk above tolerance, and circulates the pack through the AW-01 paper deadline. Missing inputs are listed by name on the first page.

  4. Conduct the review. The committee considers each input, and for each records one of: no action, action with owner and date, or referral to AW-02 for resource. The required outputs are minuted explicitly: decisions on opportunities for improvement; decisions on changes to the management system, including procedures to be revised through AW-03; and resource needs, with the AW-02 route. [CONTROL] The minutes name each of the three ISO 9.3.3 output categories, even where the decision is that nothing changes.

  5. Track outputs. Actions enter the AW-01 action register and are reported at each subsequent committee meeting. Resource needs enter the AW-02 plan. Changes to procedures open AW-03 change requests. Their status is the first input to the next review.

  6. Report upward. The Senior Director, IoL, provides the minuted outputs to MBRU's institutional management review or quality function in the form MBRU requires [IoL to confirm].

Part B. External reporting calendar

  1. Build and maintain the calendar. A controlled register holds every recurring external obligation with the body, obligation, frequency and due date, row owner, producing procedure, source document (held under AW-03 as an external document of origin), approver, submitting function and evidence location. Initial rows, all dates [IoL to confirm]:

    Body Obligation Due Owner Producing procedure
    MoHESR (CAA) Institutional and programme accreditation reporting and licensure conditions ______ Programme lead WF-05
    MoHESR (CHEDS) OBEF and CHEDS annual data submission Window per WF-26 Pilot Lead WF-26 (cross-reference only)
    MoHESR Non-OBEF returns and surveys [IoL to list] ______ ______ AW-04 or producing procedure
    DHA or applicable CME accreditor CME provider accreditation reporting, activity returns [where applicable] ______ CPD lead WF-21
    ISO certification body Surveillance and recertification audit, evidence of management review and internal audit ______ Quality Lead AW-24, AW-25
    MBRU planning and finance Planning and budget submissions, year-end Per AW-02 Operations Manager AW-02
    Dubai Health Any departmental return required of MBRU academic units [IoL to confirm] ______ ______ ______
    Partners under agreement Contractual reporting to funders and partners Per agreement Partnership lead WF-17, WF-24, AW-23

    [CONTROL] A row without an owner and a source document is incomplete and is flagged at every monthly check.

  2. Issue reminders. The process owner reviews the calendar monthly and issues reminders to row owners at 60, 30 and 10 working days before each due date [IoL to confirm intervals].

  3. Prepare and approve the return. The row owner prepares the return through the producing procedure and the Senior Director, IoL, approves it. [CONTROL] No return leaves IoL without the approval recorded against the calendar row, and none is submitted in MBRU's name except by the MBRU function authorised to do so.

  4. Evidence fulfilment. The row owner records the submission date, the acknowledgement, the evidence location under AW-04 and any conditions or follow-up received. Late or deferred returns are recorded with the reason and reported at the next AW-01 meeting.

  5. Review the calendar annually. At the management review the calendar is confirmed complete, obligations added or removed, and the year's fulfilment reported.

Exception routes. A new obligation discovered mid-year is entered within 5 working days and the Senior Director, IoL, decides whether to meet the date or request a deferral. An interim management review may be called for a major external change, serious incident or major non-conformity and follows the same inputs and outputs in reduced scope.

5. Service standards

Service Standard
Management review held At least annually, before the AW-02 planning call
Call for inputs issued 20 working days before the review
Inputs returned 10 working days before the review
Pack circulated Per the AW-01 paper deadline
Minutes with outputs issued Per AW-01 (10 working days)
Calendar checked and reminders issued Monthly
New obligation entered 5 working days from discovery
Return approved At least 5 working days before the due date
Fulfilment evidenced 5 working days after submission

6. Records, retention and controls

Record System Retention Owner
Management review input pack Quality repository [IoL to confirm] 7 years, or as long as the ISO certificate cycle requires [IoL to confirm against MBRU schedule] Process owner
Management review minutes and decisions AW-01 committee repository Permanent Secretary (AW-01)
Output tracking AW-01 action register; AW-02 plan; AW-03 change requests As those procedures Respective owners
External reporting calendar with history Controlled register (AW-03) Permanent Process owner
Submitted returns, approvals, acknowledgements Evidence location per row, under AW-04 Per the AW-04 schedule; never less than the body's own requirement Row owner

Key controls. (1) Management review held and minuted at least annually. (2) Every ISO 9.3.2 input supplied by its owner with a data date. (3) Every ISO 9.3.3 output category minuted. (4) Outputs tracked through AW-01, AW-02 and AW-03. (5) Every calendar row has an owner, a source document and an evidence location. (6) Every return approved before submission and submitted only by the authorised function. (7) Fulfilment evidenced within the standard.

OBEF touchpoint. None directly. The OBEF and CHEDS row records the window, owner and evidence location; WF-26 owns the content and the capture rules.

7. Performance measures

Dimension Measure Target
Timeliness Management review held within the scheduled month Yes
Timeliness Inputs received by the deadline 100% of owners
Timeliness External returns submitted by the due date 100%
Compliance ISO 9.3.2 inputs present in the pack 13 of 13
Compliance Calendar rows with owner, source document and evidence location 100%
Effectiveness Previous review actions closed by the next review 80%
Effectiveness Obligations discovered after their due date 0
Experience Committee members reporting the pack allowed decisions without further data requests, post-review pulse 85%

8. Change control

Date Version Change Reason Approved by
2026-09-02 0.1 Initial draft IoL administrative pack draft, unapproved